Your team does in
6 weeks what a swarm
does in 6 hours.
Swarmie builds autonomous agent swarms that run your research, outbound, content, and engineering operations 24/7 β while you focus on what only you can do.
Your team is brilliant.
They're buried in execution.
The problem isn't talent. It's that every high-value person is doing work a system could do β research, drafts, follow-ups, reporting. Here's what that costs.
-
β
1,000 hours/year lost per workflow One repeatable process at 20hrs/week Γ 50 weeks = 1,000 hours. At $100 blended rate = $100,000 gone.
-
β
Research takes 3 days. Should take 3 hours. Your best people spend Tuesday gathering data your competitors already have from an agent that ran overnight.
-
β
Outbound sequences die in drafts Your sequence brief sits in a doc. Your competitor's swarm sent 200 personalized sequences before lunch.
-
β
You can't hire fast enough to scale Every new hire adds overhead, onboarding time, and churn risk. A swarm scales instantly.
-
β
Swarm runs research loops 24/7 Research agents pull signals, qualify data, and surface the three things worth acting on β every morning without asking.
-
β
Outbound on autopilot Specialist agents draft, sequence, personalize, and queue your outbound while your team sleeps.
-
β
Content factory: brief β publish Brief an agent. It researches, drafts, formats, and queues for review. Your team approves, not writes.
-
β
Engineering delivery loop automated Code review, doc generation, test coverage β running on every commit without a meeting.
Year-one math for a Launch Sprint
One automated workflow. Conservative estimates. This is why operators don't wait.
What teams are eliminating
with Swarmie swarms.
"We were spending 40 hours a week on competitive research and prospect qualification. The Swarmie swarm runs both lanes continuously. That time went directly into enterprise pipeline."
"Our content team was producing 2 articles a week. After deploying the content swarm, we're publishing 5x that volume with higher quality because the team is editing, not drafting."
"I was skeptical about the 10-day delivery promise. They shipped a working research + reporting swarm on day 9. The team had never had this kind of leverage before."
"The Command Scale tier gave us a dedicated orchestration lead who actually understood our engineering delivery cycle. The governance design alone saved us 3 months of planning."
From intent to production
in four defined steps.
Every engagement has a visible work trail, an accountable launch window, and defined success metrics agreed before build starts.
Discovery sprint
We map your revenue motions, delivery constraints, tooling stack, and where operator time is leaking.
Swarm design
Define the executive brain, specialist lanes, memory architecture, approval gates, and success signals.
Launch pilot
The swarm goes live against one concrete outcome β a campaign, sales motion, research cycle, or delivery program.
Optimization loop
Weekly gain log, prompt and role sharpening, tool access expansion. We scale only where data proves it should grow.
Choose your operating leverage.
Every tier has a defined scope, a visible work trail, and an accountable launch window. No platform markup. Cancel retainers monthly.
Launch Sprint
Fixed scope Β· delivered in 10 business days
- One priority workflow automated
- Up to 3 specialist agent roles
- One core tool or data integration
- Operator control board + approval gates
- Launch documentation and team handoff
Best for proving leverage before a broader rollout.
Growth Operator
30-day launch Β· month-to-month after setup
- Everything in Launch Sprint
- Two always-on production workflows
- Up to 7 coordinated specialist agents
- CRM, workspace, or codebase integrations
- Weekly optimization and outcome reporting
- Priority operator support and iteration
Best for replacing recurring manual operating load.
Command Scale
Custom deployment Β· dedicated command lead
- Everything in Growth Operator
- Four cross-functional production workflows
- Unlimited specialist agent roles
- Advanced permissions and governance design
- Executive KPI console and cost controls
- Dedicated strategy and orchestration lead
Best for multi-team execution with one control layer.
Everything you need to know
about agent swarms.
5 slots. Closing in
β¦.
The operators who deploy this month have a production swarm running before Q4 planning. The ones who wait join the October waitlist.
Or start with the β 10 days, fixed scope, no surprises.